Göktepe WPP
Erguvan Enerji
Constructed by Erguvan Enerji Elektrik Üretim A.Ş. , one of our subsidiary companies.
2022
Armutlu, Yalova
It is located in Yalova, Armutlu and started commercial operation in 2022.
110 MWe/112,7 MWm
Installed Power
Generates electricity with an installed capacity of 110 MWe/112,7 MWm
27
Wind Turbines
The wind farm consists of 27 wind turbines.
Electricity Consumption of
100,000 People
Supplies electricity demand of 100,000 people.
205,000 Tons
CO₂e Emission Reduction
Approximately 205,000 tons of CO₂e emission is offset annually.