Göktepe WPP
Erguvan Enerji
Constructed by Erguvan Enerji Elektrik Üretim A.Ş., one of our subsidiary companies.
2022
Armutlu, Yalova
It is located in Yalova, Armutlu and started commercial operation in 2022.
121.1 MWm / 118.4 MWe
Installed Power
Generates electricity with an installed capacity of 118.4 MWe/121.1 MWm
29
Wind Turbines
The wind farm consists of 29 wind turbines.
Electricity Consumption of
100,000 People
Supplies electricity demand of 100,000 people.
215,000 Tons
CO₂e Emission Reduction
Approximately 215,000 tons of CO₂e emission is offset annually.