Mucur, Kırşehir

Geycek WPP

2013
2013
Mucur, Kırşehir

It is located in Kırşehir, Mucur and it started commercial operation in 2013.

168 MWm / 168 MWe
168 MWm / 168 MWe
Installed Power

Turkey’s fifth largest wind power plant with a capacity of 168 MW.

70
70
Wind Turbines

The wind farm consists of 60 turbines with a capacity of 2.3 MW and 10 turbines with a capacity of 3 MW.

Electricity Supply for
Electricity Supply for
116,000 People

Supplies electricity demand 116,000 people.

240,000 Tons
240,000 Tons
CO₂e Emission Reduction

Approximately 240,000 tons of CO₂e emission is offset annually.