On October 6th, Friday, the acceptance of 2 turbines by the Ministry of Energy and Natural Resources took place at Göktepe RES, and they were put into operation. With this acceptance, the installed capacity of Göktepe RES has increased from 112.7 MWm/110 MWe to 121.1 MWm/118.4 MWe.