Kepsut, Balıkesir

Poyraz WPP

Poyraz Enerji
Poyraz Enerji

Constructed by Poyraz Yenilenebilir Enerji Üretim A.Ş.., one of our subsidiary companies. daha fazla..

2012
2012
Balıkesir, Kepsut

It is located in Balıkesir, Kepsut and started commercial operation in 2012.

77.1 MWm / 66.9 MWe
77.1 MWm / 66.9 MWe
Installed Power

Generates electricity with an installed capacity of 66.9 MW.

34
34
Wind Turbines

The wind farm consists of 33
turbines with a capacity of 2 MW and 1 turbine with a capacity of 0.9 MW.

Electricity Consumption of
Electricity Consumption of
61,000 People

Supplies electricity demand of 61,000 people.

125,000 Tons
125,000 Tons
CO₂e Emission Reduction

Approximately 125,000 tons of CO₂e emission is offset annually.