Aliağa, İzmir

Seyitali WPP

2011
2011
İzmir, Aliağa

It is located in İzmir, Aliağa and it started commercial operation in 2011.

41.5 MWm / 40.7 MWe
41.5 MWm / 40.7 MWe
Installed Power

Generates electricity with an installed capacity of 41.5 MWm/40.7 MWe.

18
18
Wind Turbines

The wind farm consists of 18 turbines.

Electricity Supply for
Electricity Supply for
33,000 People

Supplies electricity demand of 33,000 people.

70,000 Tons
70,000 Tons
CO₂e Emission Reduction

Approximately 70,000 tons of CO₂e emission is offset annually.