DOĞAL ENERJİ ELEKTRİK ÜRETİM A.Ş.
Burgaz RES
Burgaz Wind Energy Power Plant, whose generation license is dated on 11 September 2003, is located in the province of Canakkale (Dardanelles), district of Gelibolu, locality of Burgaz-Munip Farm. There are 18 wind turbines in Burgaz WPP, in which 20 million Euros have been invested. Our power plant which has an installed capacity of 14.9 MW started generating in August 2007. The prospective amount of annual electricity generation is approximately 50.000 MW.
Sayalar RES
Sayalar Wind Energy Power Plant, whose generation license is dated on 13 April 2004, is located in the province of Manisa, district of Sayalar, locality of Rahmanlar-Akkocalı-Gokcealan. Our powerplant, in which 40 million Euros have been invested, has an installed capacity of 30.4 MW. In this WPP, which started generating in May 2008, the prospective amount of annual generation is approximately 110.000-115-000 MW. Within the framework of contributing to decrease the emission of greenhouse gas, Sayalar Power Plant is one of the three wind power plants which received the VER Goldstandart Certificate in Turkey.
Kozbeyli RES
Kozbeyli Wind Energy Power Plant, whose generation license is dated on 6 December 2007, is located in the province of Izmir, district of Foca, locality of Kozbeyli-Kocamehmetler. Our WPP which will be set up with 15 wind turbines will have an installed capacity of 30 MW.
Samurlu RES
Samurlu Wind Energy Power Plant, whose generation license is dated on 6 December 2007, is located in the province of Izmir, district of Aliaga, locality of Hatunderekoy-Karahasandagi-Ayikayasi. Our power plant which will be set up with 15 wind turbines will have an installed capacity of 30 MW
DORUK ENERJİ ELEKTRİK ÜRETİM A.Ş.
Seyitali RES
Doruk Wind Energy Power Plant, whose generation license is dated on 4 April 2007, is located in the province of Izmir, district of Aliaga. Our power plant which will be set up with 15 wind turbines will have an installed capacity of 30 MW. The plant is planned to start generating in 2009.
POYRAZ ENERJİ ELEKTRİK ÜRETİM A.Ş.
Poyraz RES
Poyraz Wind Energy Power Plant, whose generation license is dated on 4 April 2007, is located in the province of Balikesir, district of Kepsut. Our power plant which will be set up with 28 wind turbines will have an installed power of 54.9 MW. The plant is planned to start generating in 2009.
SOMA ENERJİ ELEKTRİK ÜRETİM A.Ş.
Soma RES
Soma Wind Energy Power Plant, whose generation license is dated on 4 April 2007, is located in the province of Manisa, district of Soma, locality of Hamidiye- Bozarmut-Tekeliişiklar-Tuzladagi-Kozluoren-Gokcukur-Sultaniye. Our power plant which will be set up with 176 wind turbines has an installed capacity of 140.8 MW and the prospective amount of annual generation is 500.000 MW. The plant which is planned to start generating in 2009 will have an investment of 225 million Euros. |
| |
|
 |
|